Reports
-
Airport Wash Basin Management Study
Pima County Regional Flood Control District is working on the Airport Wash Basin Management Study Phase 2 to identify the drainage and flooding hazards within the Airport Wash watersheds and develop alternatives to address those hazards.
Link to page -
Airport Wash South Basin Management Study
Pima County Regional Flood Control District has completed the Airport Wash South Basin Management Study to identify the drainage and flooding hazards within the Valencia, El Vado, Santa Clara, and Hughes watersheds and develop alternatives to address those hazards.
Link to page -
Alamo Wash Basin Management Study
The purpose of the Alamo Wash Basin Management Plan is to identify flood hazard areas and drainage problems to develop cost-effective solutions to alleviate or manage flooding in the project area.
Link to page -
Annual / Comprehensive Reports
The District creates Annual Reports and 5-year Comprehensive Program Reports to keep the public and public officials updated on the activities of the District.
Link to page -
Brawley Wash Watershed Plan
Pima County is conducting the Brawley Wash Watershed Plan/Environmental Assessments to develop and study potential alternatives in creating a long-term plan to reduce flooding and erosion in the Brawley Wash watershed.
Link to page -
Floodplain Studies
Discover the many floodplain studies of the Pima County area and access important resources to learn more about their findings.
Link to page -
Incorporated Areas
Gather information about the various incorporated area studies of Pima County Flood Control.
Link to page -
Lee Moore Wash Basin Management Study
Pima County Regional Flood Control District has completed the Lee Moore Wash Basin Management Study to identify the drainage and flooding hazards within the watershed and develop alternatives to address those hazards.
Link to page
-
Paseo de las Iglesias Reports
Review draft and Final Environmental Impact Statements and Feasibility reports from the U.S. Army Corps of Engineers (USACOE) for the Paseo de las Iglesias project.
Link to page -
Sabino Creek & Bear Canyon Wash Mapping
The Sabino Creek and Bear Canyon Wash Risk Analysis and Mapping project is part of a FEMA grant for three separate floodplain mapping activities.
Link to page -
Santa Cruz River Management Plan
The purpose of the Santa Cruz River Management Plan is to develop a management strategy to balance flood risk management, drainage infrastructure protection, water resources, recreation, education opportunities, public safety and riparian habitat preservation for the Santa Cruz River from the Santa Cruz County Line to the Pinal County Line.
Link to page -
South Tucson Hydrologic & Hydraulic Mapping
The purpose of this study is to provide 100-year and 10-year peak discharges and associated floodplain boundaries for the City of South Tucson.
Link to page -
U.S. Army Corps of Engineers (USACE)
Review the reports of the U.S. Army Corps of Engineers.
Link to page -
Upper Santa Cruz RiskMAP Study
The purpose of the Upper Santa Cruz RiskMAP Project is to identify flood risks along the Santa Cruz River within Pima County from the Santa Cruz County line, north to Interstate 19.
Link to page -
Water & Riparian Resources
See water resources, riparian habitat and SDCP reports.
Link to page