Standard Details
See Engineering Directives for updates to standard details and policies. Links to pertinent directives are also found at the end of Standard Detail sections.
* Denotes Detail No Longer Accepted for New Construction
Complete Set of Standard Details
- Standard Detail set (13 MB pdf)
Details are available individually for easier downloading below:
General
- A-1 Guidelines for Variances
- A-2 Wastewater Pumping Systems
- A-3 Gravity or Pressure Sewer
- A-4 Landscaping
- A-5 Flow Management Plan - see Engineering Directive below
- 2005-04 - Engineering Standards Committee
- 2005-05 - Maintenance Vehicle Access within Cul-de-Sacs
- 2005-06 - Short Easement Access
- 2006-09 - Flow Management Considerations During Design
- 2006-11 - Survey Cut Sheet Deliverable
- 2009-18 - Sewer Pipe Slope and Manhole Invert Construction Tolerance
- 2009-19 Sewer Design and As-built Slope Annotation, effective January 1, 2010
Gravity Mains (100 Series)
- 101 - Pile Supported Sanitary Sewer
- 102 - Sewer Main Repair
- 103 - Coupling for Unlike Pipe Materials Together
- 104 - Rigid Pipe Bedding for Sanitary Sewers (See Engineering Directive 2008-16)
- 105 - Flexible Pipe Bedding for Sanitary Sewers (See Engineering Directive 2008-16)
- 106 - General Notes - Sewer Construction
- 107 - Deflection Testing Mandrel
- 108 - Sewer/Water Crossing Details
- 109 - Sanitary Sewer Easement
- 110 - Right Angle Turn Around
- 111 - Typical Sewer Easement Section
- 2005-03 - Public Sewer Stub-out
- 2008-16 - Revised Sand Bedding - Standard Details WWM-104 and WWM-105.
- 2008-17 - CCTV Inspection for New Sewer Construction Acceptance
- 2009-18 - Sewer Pipe Slope and Manhole Invert Construction Tolerance
- 2009-19 Sewer Design and As-built Slope Annotation, effective January 1, 2010
Manholes, Cleanouts & Appurtenant Items (200 Series)
- 201 - Manhole Base (21" Dia. Pipe and Smaller)
- 202 - Manhole Base (24" to 48" Dia. Pipe)
- 203 - Manhole Stub-Out and Block-Out
- * 204 - Standard Brick Manhole *
- * 205 - Precast Concrete Manhole (4' Dia.) *
- * 206 - Standard Precast Concrete Manhole (5' Dia.) *
- 207 - Shallow Manhole
- 208 - Flat Top Manhole (4' Dia.)
- 209 - Flat Top Manhole - Type "A"
- 210 - Flat Top Manhole - Type "B"
- 211 - Flat Top Manhole - Type "C"
- 212 - Concrete Manhole Collar (Unpaved Areas)
- 213.0 - Manhole Frame and Cover (Standard)
- 213.1 - Manhole Frame and Cover (24")
- 213.2 - Manhole Frame and Cover (24" Waterproof)
- 213.3 - Manhole Frame and Cover (24" Bolted)
- 214.0 - Manhole Frame and Cover (30")
- 214.1 - Manhole Frame and Cover (30" Waterproof)
- 214.2 - Manhole Frame and Cover (30" Bolted)
- 216 - Manhole Step - Type 1
- 217 - Manhole Step - Type 2
- 218 - Manhole Step - Type 3
- 219 - Concrete Weir
- 220 - Redwood Gate Detail
- 220.1 - Redwood Gate Detail
- 221.1 - Manhole Vent Assembly Detail
- 221.2 - Modified Manhole Vent Assembly
- * 222 - Precast Concrete Manhole Safety Landing *
- 223 - Manhole Joint Reinforcement - Revised 8-05, see Engineering Directive 02 below
- 224 - Sewer Marker
- 225 - Monitoring Station
- 2005-02 - Manhole with joint reinforcement - Standard Detail 223
- 2006-10 - Cones and Grade Rings in Manhole Construction
- 2006-13 - Manhole Invert Slopes
- 2006-15 - Manhole Interior Coating Requirements
- 2009-18 - Sewer Pipe Slope and Manhole Invert Construction Tolerance
Modifications of Existing System Facilities (300 Series)
- 301 - Connection to Existing Manhole (Non-Reinforced Base)
- 302 - Connection to Existing Manhole (Reinforced Concrete Base)
- 303 - New Manhole Over an Existing Sewer
- 304 - Brick Manhole Grade Adjustment
- 305 - Precast Concrete Manhole Grade Adjustment
- 306 - Flat Top Manhole Grade Adjustment
- 307 - Manhole
Channel Cover
House Connections (400 Series)
- 401 - House Connection Sewer (H.C.S.) - Revised 6-28-06, see Engineering Directive 01 below
- 402 - H.C.S. Connection to Manhole
- 404 - H.C.S. Rerouting
- See Ordinance Governing Repair and Replacement of House Connection Sewers and Department policy based on the ordinance, including procedure for requesting RWRD assistance with private HCS repairs
- 2005-01 - Private Service Lateral (HCS) Design and Construction
Requirements - Standard Detail 401
- Memorandum of Understanding Regarding Construction of Private Cleanouts - March 28, 2007.
Based on the 2005-01 Directive, this form is a required submittal ensuring adherence to PCRWRD's HCS cleanout standards and listing all lots with buried HCS cleanouts.
- Memorandum of Understanding Regarding Construction of Private Cleanouts - March 28, 2007.
- 2006-08 - Private Sewer Laterals in a Terminal Manhole
Pressure Sewer Systems (500 Series)
- 504 - Marker Tape Location
- 505 - Pressure Main Connection to Manhole
- 507 - Pressure Sewer Location Monuments
- 509 - Private Pump Station Dual Outlet Air Injection Panel
- 510 - Shade and Equipment Support Structure
- 511 - Test Station

