Standard Details
* Denotes Detail No Longer Accepted for New Construction
See Engineering Directives for updates to standard details and policies. Links to pertinent directives are also found at the end of Standard Detail sections.
Complete Set of Standard Details
- Standard Detail set (13 MB pdf)
Details are available individually for easier downloading below:
General
- A-1 Guidelines for Variances
- A-2 Wastewater Pumping Systems
- A-3 Gravity or Pressure Sewer
- A-4 Landscaping
- A-5 Flow Management Plan - see Engineering Directive below
- 2005-04 - Engineering Standards Committee
- 2005-05 - Maintenance Vehicle Access within Cul-de-Sacs
- 2005-06 - Short Easement Access
- 2006-09 - Flow Management Considerations During Design
- 2006-11 - Survey Cut Sheet Deliverable
- 2009-18 - Sewer Pipe Slope and Manhole Invert Construction Tolerance
- 2009-19 Sewer Design and As-built Slope Annotation, effective January 1, 2010
Gravity Mains (100 Series)
- 101 - Pile Supported Sanitary Sewer
- 102 - Sewer Main Repair
- 103 - Coupling for Unlike Pipe Materials Together
- 104 - Rigid Pipe Bedding for Sanitary Sewers (See Engineering Directive 2008-16)
- 105 - Flexible Pipe Bedding for Sanitary Sewers (See Engineering Directive 2008-16)
- 106 - General Notes - Sewer Construction
- 107 - Deflection Testing Mandrel
- 108 - Sewer/Water Crossing Details
- 109 - Sanitary Sewer Easement
- 110 - Right Angle Turn Around
- 111 - Typical Sewer Easement Section
- 2005-03 - Public Sewer Stub-out
- 2008-16 - Revised Sand Bedding - Standard Details WWM-104 and WWM-105.
- 2008-17 - CCTV Inspection for New Sewer Construction Acceptance
- 2009-18 - Sewer Pipe Slope and Manhole Invert Construction Tolerance
- 2009-19 Sewer Design and As-built Slope Annotation, effective January 1, 2010
Manholes, Cleanouts & Appurtenant Items (200 Series)
- 201 - Manhole Base (21" Dia. Pipe and Smaller)
- 202 - Manhole Base (24" to 48" Dia. Pipe)
- 203 - Manhole Stub-Out and Block-Out
- * 204 - Standard Brick Manhole *
- * 205 - Precast Concrete Manhole (4' Dia.) *
- * 206 - Standard Precast Concrete Manhole (5' Dia.) *
- 207 - Shallow Manhole
- 208 - Flat Top Manhole (4' Dia.)
- 209 - Flat Top Manhole - Type "A"
- 210 - Flat Top Manhole - Type "B"
- 211 - Flat Top Manhole - Type "C"
- 212 - Concrete Manhole Collar (Unpaved Areas)
- 213.0 - Manhole Frame and Cover (Standard)
- 213.1 - Manhole Frame and Cover (24")
- 213.2 - Manhole Frame and Cover (24" Waterproof)
- 213.3 - Manhole Frame and Cover (24" Bolted)
- 214.0 - Manhole Frame and Cover (30")
- 214.1 - Manhole Frame and Cover (30" Waterproof)
- 214.2 - Manhole Frame and Cover (30" Bolted)
- 216 - Manhole Step - Type 1
- 217 - Manhole Step - Type 2
- 218 - Manhole Step - Type 3
- 219 - Concrete Weir
- 220 - Redwood Gate Detail
- 220.1 - Redwood Gate Detail
- 221.1 - Manhole Vent Assembly Detail
- 221.2 - Modified Manhole Vent Assembly
- * 222 - Precast Concrete Manhole Safety Landing *
- 223 - Manhole Joint Reinforcement - Revised 8-05, see Engineering Directive 02 below
- 224 - Sewer Marker
- 225 - Monitoring Station
- 2005-02 - Manhole with joint reinforcement - Standard Detail 223
- 2006-10 - Cones and Grade Rings in Manhole Construction
- 2006-13 - Manhole Invert Slopes
- 2006-15 - Manhole Interior Coating Requirements
- 2009-18 - Sewer Pipe Slope and Manhole Invert Construction Tolerance
Modifications of Existing System Facilities (300 Series)
- 301 - Connection to Existing Manhole (Non-Reinforced Base)
- 302 - Connection to Existing Manhole (Reinforced Concrete Base)
- 303 - New Manhole Over an Existing Sewer
- 304 - Brick Manhole Grade Adjustment
- 305 - Precast Concrete Manhole Grade Adjustment
- 306 - Flat Top Manhole Grade Adjustment
- 307 - Manhole
Channel Cover
House Connections (400 Series)
- 401 - House Connection Sewer (H.C.S.) - Revised 6-28-06, see Engineering Directive 01 below
- 402 - H.C.S. Connection to Manhole
- 404 - H.C.S. Rerouting
- See Ordinance Governing Repair and Replacement of House Connection Sewers and Department policy based on the ordinance, including procedure for requesting RWRD assistance with private HCS repairs
- 2005-01 - Private Service Lateral (HCS) Design and Construction
Requirements - Standard Detail 401
- Memorandum of Understanding Regarding Construction of Private Cleanouts - March 28, 2007.
Based on the 2005-01 Directive, this form is a required submittal ensuring adherence to PCRWRD's HCS cleanout standards and listing all lots with buried HCS cleanouts.
- Memorandum of Understanding Regarding Construction of Private Cleanouts - March 28, 2007.
- 2006-08 - Private Sewer Laterals in a Terminal Manhole
Pressure Sewer Systems (500 Series)
- 504 - Marker Tape Location
- 505 - Pressure Main Connection to Manhole
- 507 - Pressure Sewer Location Monuments
- 509 - Private Pump Station Dual Outlet Air Injection Panel
- 510 - Shade and Equipment Support Structure
- 511 - Test Station