Engineering Standards for the Design and Construction of Public Sanitary Sewers
Can't Find What You Want? Call us at 724-6500
The New 2012 Engineering Standards for Design and Construction
The new 2012 Standards for Public Sanitary Sewers in Pima County were approved and adopted by the Pima County Board of Supervisors on December 18, 2012. These Standards are divided into two separate documents:
See the indexed Pima County Regional Wastewater Reclamation Department's Engineering Design Standards 2012
See the indexed Pima County Regional Wastewater Reclamation Department's Standard Specifications and Details for Construction 2012
Hard copies are NOT available through the Pima County Regional Wastewater Reclamation Department.
View a brief PowerPoint presentation summarizing what's new in the 2012 Engineering Standards for Design and Construction.
Please note that the new 2012 Design Standards do NOT include the requirements for how new public sanitary sewer facilities are to be shown on tentative plans and development plans, nor does it supersede the Preliminary Sewer Layout Requirements, March 1984 that was adopted by Resolution (1984-44) of the Pima County Board of Supervisors.
Errors/Corrections
The following errors were found in the new 2012 Standards for Public Sanitary Sewers in Pima County after it was approved and adopted by the Pima County Board of Supervisors on December 18, 2012. Please click on the link to each page shown below, markup corrections are shown in red.
- Page i of the Engineering Design Standards 2012
- Page 5-1, Subsection 5.1.1 of the Engineering Design Standards 2012
Previous Engineering Standards for Design and Construction
The previous standards that are being replaced with the new 2012 standards will remain applicable for new projects that are submitted for 1st review before February 18, 2013. First submittals include tentative subdivision plats, final subdivision plats, development plans, landscape plans, paving and grading plans, and public sanitary sewer construction plans. The previous standards are available through the following links:
- 1983/84 Procedures and Design Standards for Public Sewer Facilities
- 2003 Standard Specifications for Public Sewer Facilities (see Sections 508, 509 and 1010)
- 2003 Standard Details for Public Sewer Facilities (Series WWM – Sanitary Sewer)
- Engineering Directives (2005 through 2012)
See the official announcement that describes how the new 2012 standards will be implemented and the previous standards phased out
Questions?
Please direct all questions or found errors to:
Attn: Carol A. Johnson, P.E., Sanitary Engineering Manager
201 N. Stone Ave., 3rd Floor
Tucson, AZ 85701