Procurement

link to pima.gov
 

Roger Road Water Reclamation Campus

Request for Proposal
Table 1-1 -- Reference Documents

 

No.

Description

Organization

Date

1

 

Regional Optimization Master Plan (ROMP)

 

Greeley and Hansen

November 2007

2

 

WRC Geotechnical Investigations Phase I

 

Terracon

September 2, 2008

 

WRC Geotechnical Investigations Phase II

 

Terracon

June 10, 2009

 

Tucson Water Soils Information

 

Tucson Water

January 18, 1990

3

 

Closure Sampling of Sludge Drying Beds, Pima County Wastewater Management, Roger Road Pollution Control Facility, Tucson, Arizona

 

PCRWRD

-

4

 

Survey information (boundary, topographic, setbacks, waivers, easements) - zipped file

 

Ashby Surveying and Drafting Inc

November, 2009

5

 

Intergovernmental Agreement between the City of Tucson and Pima County for Treating Effluent and Wheeling Reclaimed Water (Contract No. 01-03-T-133586-1203)

 

A - Treating & Wheeling

 

B - Initial IGA Transfer

 

C - Exhibits for initial IGA

 

Pima County/City of Tucson

December 8, 2003

6

 

Intergovernmental Agreement between the City of Tucson, Pima County, and the Pima County Regional Flood Control District for Access to Effluent and Land and Easement Acquisitions (Contract No. 01-03-T-141787-0409)

 

A - Conservation Effluent Plan

 

B - Supplemental Effluent IGA

 

C - Capital Costs for Effluent

 

 

Pima County/City of Tucson

March 2009

7

 

Current influent wastewater parameter information (one year) – flow/constituents

 

PCRWRD

2008

8

 

Drawings/details of the Plant Interconnect at point of diversion and the diversion structure

Jpeg file page 25
Jpeg file page 26

 

Brown & Caldwell

October 3, 2008 (Preliminary)

9

 

Alternative Delivery Methods 

 

Greeley and Hansen

August 2008

10

 

Cultural Resources Inventory: PCRWRD Sweetwater Reclamation Campus

 

Tierra

this document will not be available

11

 

Phase I Environmental Site Assessment

 

Phase I Environmental Site Assesment_Part1.pdf

Phase I Environmental Site Assesment_Part2.pdf

Phase I Environmental Site Assesment_Part3.pdf

Phase I Environmental Site Assesment_Part4.pdf

Phase I Environmental Site Assesment_Part5.pdf

Phase I Environmental Site Assesment_Part6.pdf

 

Arizona Department of Environmental Quality Registry Sites

 

Shannon Road/El Camino del Cerro (hydrologically downstream)

Narrative Site Information

Site Map

Fact Sheet

El Camino del Cerro

 

Registry Report

Shannon Road-Rillito Creek Registry Report

CAB Meeting Agendas and Minutes

 

 

Silverbell Landfill (hydrologically upstream)

Narrative Site Information

Site Map

Fact Sheet

Registry Report

 

 

 

SWCA

January 2009

12

 

Memorandum – Conditional Archaeological Clearance for the Regional Wastewater Reclamation Department Sweetwater Reclamation Campus Facility Replacement Project

 

Pima County Administration Cultural Resource Office

January 27, 2009

13

 

SCADA Standard Specifications

PCRWRD

-

14

 

A - Sludge Pumping Station - Standard Operating Proceedure


B - Sludge Line - Manhole Rehabilitation Contract


C- Sludge Line - Manholes not in Rehabilitation Contract.

PCRWRD

-

15

 

Pima County Landscape Design Manual

Pima County Development Services

-

16

 

Pima County Storm Water Management Program

 

PDEQ

-

17

 

Voice and Data Communication Cabling Standards

 

Information Technology Procedure

 

PCRWRD

May 22, 2009 (revised)

18

 

Memorandum of Understanding

Pima County/SEIU

June 15, 2009

19

 

Addition of New Assets for Major Construction Projects

 

PCRWRD

February 2009

20

 

ROMP Contract Project Controls Requirements

 

Greeley and Hansen/Parsons

-

 

21

 

Tucson water Pumping Station

 

170_1995_073

 

170_1995_074

 

170_1995_075

 

170_1995_076

 

170_1995_077

 

170_1995_078

 

170_1995_079

 

 

 

Tucson Water

August 1995


Service Contract -- Appendix 3, Attachment A
(WATER RECLAMATION CAMPUS ARCHITECTURAL THEME AND CHARACTER)

 

 

 

Supplemental

e.      Survey information (boundary and topographic)

Topo Map
Survey Information Assessor’s Record Map
Deed with Legal Description 


 
h.      Future effluent permit requirements (ADEQ/APP permits)

H_5-26-05 - Roger Road APP 100655.pdf

H_4 20 04 Reclaimed water re use permit.pdf

H_3-2-06 Roger Road AZPDES Permit Fact Sheet.pdf

H_3-2-06 Roger Road AZPDES Final Permit.pdf


 i.       Basis of Design for Benchmark Facility

 

l.       Drawings/details of the Roger Road WRF outfall pipeline from the contact chamber through the river levee,
         where the new effluent connection will be made. - Not available yet.

m.    Information on solar energy project, as applicable to the WRC project
 
o.     Water Reclamation Campus Location Alternatives - Jan 2008

 

s.    Final Levee Certification by Psomas

Figure 1 Vicinity.pdf

Figure 2 Location.pdf

Figure 3_Sheet 1 of 5.pdf

Figure 3_Sheet 2 of 5.pdf

Figure 3_Sheet 3 of 5.pdf

Figure 3_Sheet 4 of 5.pdf

Figure 3_Sheet 5 of 5.pdf

Text_Levee Cert.pdf

 

t.    Sludge Forcemain

SHEET25.pdf
SHEET26.pdf


county seal

Copyright © 2009, All rights reserved

 
Privacy Statement / Disclaimer