Regional Optimization Master Plan (ROMP)
a. Regional Optimization Master Plan (ROMP)
b. Digester Gas Equipment Replacement Project Concept Design Report
• Biogas Samples c. Architectural concepts development d Alternative Delivery Methods e. Ina Road TEP bill data
f. Cultural Resources Memorandum for the site g. Ina Energy Management data (includes natural gas purchase costs) h. Biogas Utilization Study
i. Existing Air Quality Operating Permit:
• Ina Road Air Quality Permit Sepember 12,2005.pdf
• Air Quality Technical Support Document August,2005.pdf
Copyright © 2009, All rights reserved