Sewer Collection System Plan Approval Process and Forms


PDEQ is authorized to review and approve plans for sewage collection system extensions, modifications, or relocations, in order to ensure the work is constructed in accordance to State standards. Sewage collection system projects include the installation of extensions, modifications, or relocations of:  gravity sewer main(s), manhole(s), force main(s), and lift station(s).

All public sewer projects that have a design flow greater than 3000 gallons per day (gpd), are required to obtain a Construction Authorization (CA) from PDEQ prior to beginning construction.  All private sewer projects that meet the review criteria per Arizona Administrative Code, Title 18, Chapter 9, Section E.301.A, are required to obtain a CA from PDEQ prior to beginning construction.  The CA is valid for two (2) years from the date issued.  If the Department does not receive all verification documents within two years after the date the CA is issued, the CA will expire and the person shall not continue the construction of the project or discharge into it.  The applicant shall submit a new Notice of Intent to Discharge (NOID) in order to continue construction of this project.

In order to apply for a CA for a public sewer project, please follow the Public Sewer Plan Review SUBMITTAL Checklist. If the work is for a private sewer project, that will be privately maintained, please review the Private Sewage Collection System Workflow Sheet to determine if a CA is required.  If a CA is required for the private sewer project, please follow the Private Sewer Plan Review SUBMITTAL Checklist and draft O&M Manual Checklist guidance documents.  In either case, please use the  NOID when submitting a public or private sewer project for review.  If the sewer project will incorporate an alternative design, setback, installation, or operational feature, the applicant must submit a completed A312.G request with the NOID and include an additional $75.00 review fee.

Sewer project designers should consult the Pima County Wastewater Management's Standard Specifications and Standard Details to ensure compliance and review PDEQ’s plan review check lists (sewer check list and force main and lift station check list) before submitting the plans for review.

Once a design has been accepted for review, PDEQ will evaluate the submittals for conformance with Arizona Administrative Code, Title 18, using the appropriate review checklist(s):  Private Sewer Lift Station and Force Main Plan REVIEW Checklist, Public Sewer Collection System Plan REVIEW Checklist, and Private Sewer Collection System Plan REVIEW Checklist.  It is suggested that designers consult these checklists before submitting projects for review to ensure completeness and eliminate as many factors requiring comment letters and resubmits as possible.

Prior to placing the sewer project in service, the applicant shall obtain the Discharge Authorization (DA). If the project is for a public sewer, Pima County Wastewater Management will submit the necessary paperwork to receive the DA.  If the project is for a private sewer, the applicant shall submit to PDEQ:  two (2) copies of the "As-built" plans, one (1) copy of the Engineer's Certificate of Completion ("Certificate of Compliance") , an Operation and Maintenance Signed Certificate Form, and the results of all required testing (e.g. manhole testing, forcemain pressure, deflection, uniform slope, and leakage testing). Upon review, and if acceptable, PDEQ will issue the DA.

WHAT'S NEW?

Private Sewer applicants now need to submit an Operation and Maintenance Signed Certificate Form, along with the previously required documents, to receive a Discharge Authorization (DA).

     FORMS LINKS OF INTEREST



Notice of Intent to Discharge (NOID)

Public Sewer Plan Review SUBMITTAL Checklist

Public Sewer Collection System Plan REVIEW Checklist

Private Sewage Collection System Workflow Sheet

Private Sewer Plan Review SUBMITTAL Checklist

Private Sewer Collection System Plan REVIEW Checklist

Private Sewer Lift Station and Force Main Plan REVIEW Checklist

O&M Manual Checklist

A312.G request

Engineer's Certificate of Completion ("Certificate of Compliance")

Manhole Test Sheet

Sewer Line Test Sheet (deflection, uniform slope, leakage)

Forcemain Pressure Test Sheet

Operation and Maintenance Signed Certificate Form



 

   • Arizona Administrative Code,
Title 18, Chapter 9

   • Pima County Wastewater Management's Standard Specifications and Standard Details

 


 
 
 
 

 

 

 

 